Ceiling Paint

" "It is a water-based, strong, long-lasting, breathable, high covering ceiling paint. During the application, the surface temperature and the ambient temperature should be between 5-30°C. Apply in two coats, waiting for a minimum of 2-3 hours between coats. Dirt, dust, and blistered or spilled paint must be thoroughly cleaned."

Surface Preparation&Application All surfaces must be smooth, dry and cleaned of dirt and dust. Cavities and cracks should be filled and if you want a uniform flat surface can be achieved by applying putty. According to the surfaces should be applied Primer as a single coat. It should be applied to surfaces in two coats after 18-24 hours of application of primer. On between coats, should be waited at least 3 hours. The ambient and surface temperature should be between 5-30°C during application.
Thinning / Blending Ratio Thin with water by 20-25%.
Coverage Area 18-20 m²/L on single coat.
Drying Time At 25°C, it completes its first drying in 1 hour and its hard drying in 24 hours.
Recommended Application Tools Satin roller, interior roller and brush.
Package 10 KG - 20 KG
Try The Fly Paint now for high quality and affordable paint solutions. High quality paint brand worldwide.
High technology
80%
Customer satisfaction
95%
Export
75%
Have you ever tried Fly Boya?